* In preparing the passage for arrival in port, has the pre-pilotage information exchange taken place?
* Has the passage plan been updated following receipt of the shore to ship Pilot/Master Exchange form and all latest navigational warnings?
* Has the ETA been sent with all relevant information required by local regulations?
* Is it necessary to rearrange cargo ballast?
* Has the following equipment been prepared and checked?
- Course and engine movement records
- Clock synchronisation
- Communications with the E/R control and mooring stations
- Signalling equipment, including:
Flags
Lights
- Deck lighting
- Mooring winches and lines including heaving lines
- Pressure on fire main
- Anchors cleared away
- Stabiliers and log tubes housed
- Has the steering gear been tested, and has manual steering been engaged in sufficient time for the helmsman to become accostumed before manoeuvring commences?
- Have the engines been tested and prepared for manoeuvring?
- Has the Pilot Card been completed and are the Pilot embarkation arrangements?
- Have VHF channels for the various services been noted and radio check carried out?
VTS
Pilot
Tugs
Berthing instructions
Agent
Others
- Has the Port been made fully aware of any special berthing requirements that the ship may have?
- Other check.
Ningún comentario todavía
Publicar un comentario